Site start
Housing site start — Rathgar
Rathgar, Dublin
1 commencement notice · start date 27 Jun 2022 · planning reference given
Planning 3751/21 · Planning application
- Commencement notices
- 1
- Latest start date
- 27 Jun 2022
- Latest notice
- 173 m²
- Planning reference
- 3751/21
- Location
- Rathgar, Dublin
Location
Where the site is
- Area
- Rathgar, Dublin
- County
- Dublin
Addresses on the notices
- roof level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Change of use from commercial garage to residential use; and proposed development to consist of demolition of existing garage building and existing rear lean-to extension; to accommodate the construction of a proposed infill dwelling comprising 1 No. two-storey, three-bedroom house; incorporating proposed carport/bicycle parking to front of dwelling, maintaining existing access from Garville Lane via proposed widened vehicular entrance; proposed rooflight chimney and rooflights at roof level; and associated landscaping and ancillary site works.
Floor area stated for this source: 173 m².
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.