Site start
Housing site start — Dublin
Dublin 6W, Dublin
1 commencement notice · start date 18 Nov 2019 · planning reference given
Planning SD19B/0304 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 18 Nov 2019
- Latest notice
- 228 m²
- Planning reference
- SD19B/0304
- Location
- Dublin 6W, Dublin
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: SD19B/0304 South Dublin County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Dublin 6W, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD19B/0304. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alterations to the previously approved works (Planning Ref: SD19B/0018) consisting of (1)reduction of permitted first extension to the side of the existing dwelling. (2)reduction of permitted first floor extension to the rear of the existing dwelling. (3)reduction of permitted ground floor extension to the rear of existing dwelling. (4)removal of permitted porch and bay window extension to ground floor front elevation. (5)omission of permitted attic conversion with a new dormer rooflight to the rear roofslope. (6)all associated alterations to the elevations, internal layouts, site, drainage, ancillary and landscaping works
Floor area stated for this source: 228 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.