Commencement notice group

Housing commencement notices — Kildare

Kildare, Kildare

5 unique commencement events · latest notified commencement 21 Apr 2022 · planning reference supplied

Unique commencement events
5
Latest notified commencement
21 Apr 2022
Latest notice
4 units
Planning references supplied
18/1026
Public location
Kildare, Kildare

Public source geography

Site location

Public site / locality
Kildare, Kildare
County
Kildare

Public site labels seen across the notices

  • ground floor level and 2 no
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 18/1026. Official council planning portal Verified official link Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

SN0007138KE BCMS open-data feed

The development comprises of the construction of a 2-storey building containing 4 no. residential units; 2 no. 1 bedroom apartments at ground floor level and 2 no. 1 bedroom apartments at first floor level. Each residential unit has own door access

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 244 m².

Planning reference 18/1026
SN0007137KE BCMS open-data feed

The development comprises of the construction of a 2-storey building containing 4 no. residential units; 2 no. 1 bedroom apartments at ground floor level and 2 no. 1 bedroom apartments at first floor level. Each residential unit has own door access.

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 244 m².

Planning reference 18/1026
SN0007136KE BCMS open-data feed

The development comprises of the construction of a 2-storey building containing 4 no. residential units; 2 no. 1 bedroom apartments at ground floor level and 2 no. 1 bedroom apartments at first floor level. Each residential unit has own door access.

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 244 m².

Planning reference 18/1026
CN0084429KE BCMS open-data feed

Construction of 35 no. houses consisting of 1 no. 2 storey, 3 bedroom H-Type house, and 20 no. 2 storey, 3 bedroom L-Type houses, 8 no. 3 storey, 4 bedroom G-Type houses, 6 no. 3 storey, 4 bedroom D-Type houses, and all associated site works.

Work stated for this notice 35 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 4,386 m².

Planning reference 18/1026
CN0083466KE BCMS open-data feed

Construction of 30 no. houses consisting of 18 no. 2 storey, 3 bedroom H-Type houses, and 12 no. 2 storey, 3 bedroom L-Type houses, and all associated site works.

Work stated for this notice 30 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 3,504 m².

Planning reference 18/1026

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.