Commencement notice group

Housing commencement notices — Portlaoise

Portlaoise, Laois

1 separate notice · latest notified commencement 09 Oct 2025 · planning reference supplied

Source notices
1
Latest notified commencement
09 Oct 2025
Latest notice
1 home
Planning references supplied
2360319
Public location
Portlaoise, Laois

Public source geography

Site location

Public site / locality
Portlaoise, Laois
County
Laois
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference2360319

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0134563LS BCMS owner-supplied export

demolish elements of the existing dwelling, construct a single storey extension to the south and west of the existing dwelling, associated internal and external alteration works to the existing dwelling and wastewater treatment system and polishing filter together with all associated site development works

1 home · 177 m² · stated on this notice

Planning reference 2360319 Builder stated: JMCK Building Solutions Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.