Site start
Housing site start — Rush
Rush, Dublin
2 commencement notices · latest start date 21 May 2021 · planning references given
Planning F15A/0294/E1, F16A/0148, F19A/0102
- Commencement notices
- 2
- Latest start date
- 21 May 2021
- Latest notice
- 1 house
- Planning references
- F15A/0294/E1 · F16A/0148 · F19A/0102
- Location
- Rush, Dublin
Location
Where the site is
- Area
- Rush, Dublin
- County
- Dublin
- Notice source points are up to 251 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.528840, -6.099226 Open point
- Public notice source · 53.531068, -6.099814 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
construction of new residential development of 12 no. two storey dwelling units (11 - 22 inclusive) and all associated site development works.
Floor area stated for this source: 17,064 m².
construction of new residential development of 9 no.two storey dwelling units (1 - 9 inclusive) and all associated site development works
Floor area stated for this source: 9,040 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.