Site start
Site start — Celbridge
Celbridge, Kildare
1 commencement notice · start date 18 Nov 2020 · planning reference given
Planning 17178 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 18 Nov 2020
- Latest notice
- 270 m²
- Planning reference
- 17178
- Location
- Ballymakealy Lower, Celbridge, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 1
- Open exact official planning record: 17178 Kildare County Council
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2020-11 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Celbridge, Kildare
- County
- Kildare
Addresses on the notices
- Ballymakealy Lower, Celbridge, Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 17178. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Full PLANNING PERMISSION is also sought for the erection of a new 270sqm single storey indoor training building, 10 No. new flood lights, 10 metres in height, to the existing running track and the relocation of existing site buildings, Building B – 31.4sqm canteen, and Building C – 38.1sqm storage container, Building D – 10.6sqm toilet facilities, and Building E – 24.5sqm dressing room and toilets, and the relocation of the boundary fence along the north east boundary, together with all associated drainage and site works. Revised by Significant Further Information which consists of revisions to the site layout and car parking layout to allay concerns of an objector to the planning application
Floor area stated for this source: 270 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.