Site start
Housing site start — Mullingar
Mullingar, Westmeath
1 commencement notice · start date 28 Nov 2024 · planning reference given
Planning 2260030 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 28 Nov 2024
- Latest notice
- 18 houses
- Planning reference
- 22/60030
- Location
- Mullingar, Westmeath
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 22/60030 Westmeath County Council · checked 2026-07-29T15:38:37+00:00
Planning 22/60030 — CONDITIONAL · Decision 2023-07-21 · Final grant 2023-09-07
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Mullingar, Westmeath
- County
- Westmeath
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Westmeath County Council planning record Application details, status and decision record for 22/60030. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
New residential development comprising the demolition of the existing vacant cottage and shed on site, the construction of 18 no. 2-storey, 3-bed semi-detached dwellings, upgrades to the current vehicular entrance and pedestrian access on site, all associated signage and hard and soft landscaping, including open space, footpaths and boundary treatments, and all associated site infrastructure and engineering works necessary to facilitate the development, all on lands adjacent to ‘The Moorings’, Ballymahon Road, Mullingar, Co. Westmeath.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.