Commencement notice group
IDA Newbridge Business & Technology Park (Littleconnel — commencement notices
Newbridge, Kildare
3 unique commencement events · latest notified commencement 24 Jul 2026 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 24 Jul 2026
- Latest notice
- 8,470 m²
- Planning references supplied
- 25/61298
- Public location
- Newbridge, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 25/61298 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Newbridge, Kildare
- County
- Kildare
Notice location variants
- IDA Newbridge Business & Technology, Park (Littleconnel), Newbridge, Co
- IDA Newbridge Business & Technology Park (Littleconnel), Newbridge,Co
- Notice source points are up to 564 m apart, so no combined representative point is shown.
Source positions remain separate:
- Public notice source · 53.188946, -6.771555 Open point
- Public notice source · 53.185010, -6.769046 Open point
- Public notice source · 53.189504, -6.765128 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 25/61298. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
This application shall refer to proposed Brewery 02 (c.8470m2) at IDA Newbridge Business & Technology, Park (Littleconnel), Newbridge, Co. Kildare. The proposed building shall be proposed as primarily industrial (production) with ancillary labs and office spaces.
Floor area stated for this source: 8,470 m².
This application shall refer to proposed New ESB Substation (c.36.8m2) at IDA Newbridge Business & Technology Park (Littleconnel), Newbridge,Co. Kildare. Proposed development shall consist of standard two room ESB layout.
Floor area stated for this source: 36 m².
Contractor's site compound, site setup, temporary entrances and general enabling civil works. The project is limited to external works and does not relate to the construction of a building. No fire safety certificate is required for the works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.