Building extension site start — Bray
Bray, Wicklow
1 commencement notice · start date 24 Apr 2025 · planning reference given
Planning 2460822 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 24 Apr 2025
- Latest notice
- Scale not stated
- Planning reference
- 24/60822
- Location
- Bray, Wicklow
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 24/60822 Wicklow County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Bray, Wicklow
- County
- Wicklow
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wicklow County Council planning record Application details, status and decision record for 24/60822. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The widening of the vehicular entrance to 3.5 m wide, demolition of the single story front projecting hall/toilet and part of the lounge and replacement with a single story projecting entrance portico, the lowering of the ground floor level by 300 mm, the construction of a single story rear extension and associated internal alterations to comprise a kitchen/dining/living room, utility room, shower room/toilet and a study at the ground floor level and to create three double bedrooms and two ensuites at the first floor level, and the conversion of the attic space to include the addition of a dormer at the rear to comprise an ensuite bedroom, associated elevational changes and a single-story play room and covered barbeque area at the end of the back garden and associated site development works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.