Site start
Building extension site start — Raheny
Raheny, Dublin
1 commencement notice · start date 28 Oct 2020 · planning reference given
Planning 2504/20 · Planning application
- Commencement notices
- 1
- Latest start date
- 28 Oct 2020
- Latest notice
- 75 m²
- Planning reference
- 2504/20
- Location
- Raheny, Dublin
Location
Where the site is
- Area
- Raheny, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Planning permission to demolish existing single storey rear extension and to re- build a two storey rear extension with pitched roof over including the installation of two rooflights to the south facing roof elevation, in addition the development will include a single storey rear dining area with flat roof over and the relocation of the existing east facing door to the south facing gable.
Floor area stated for this source: 75 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.