Housing site start — Dublin
Dublin 1, Dublin
1 commencement notice · start date 07 Mar 2022 · planning reference given
Planning 4736/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 07 Mar 2022
- Latest notice
- 1 unit
- Planning reference
- 4736/19
- Location
- Dublin 1, Dublin
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
protected structure of 5 storeys including basement. The development will consist of change of use into a 6-bedrooms residential unit and restoration works including - new removable partitions - creation of reception rooms, bedrooms, bathrooms, study, kitchen/dining room, laundry, bicycle store and other storage - installation of electrical radiators - internal insulation of external walls - fire protection to all floors - new floor screed, at basement level - replacement of existing window by external door to rear basement level - replacement of existing door by window to rear basement level - restoration and replacement of windows where necessary - installation of secondary glazing - replacement of entry door - proposed new door to front at basement level - new internal stairs from basement to ground floor - new external stairs and pedestrian gate to front - upgrade of plumbing and electrical systems - replacement of internal doors - repair / restoration / decommission of fireplaces - structural repairs to balconettes, walls and flat roof - removal of modern flat roof to basement at front - all other related works.
Floor area stated for this source: 313 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.