Site start
10 Pembroke Place, Ballsbridge
Ballsbridge, Dublin
1 commencement notice · start date 04 Dec 2018 · planning reference given
Planning 3391/15
- Commencement notices
- 1
- Latest start date
- 04 Dec 2018
- Latest notice
- 25 m²
- Planning reference
- 3391/15
- Location
- 10 Pembroke Place, Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
Addresses on the notices
- 10 Pembroke Place, Ballsbridge, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
7-Day Notice - Extension consisting of Link Corridor at gound floor level at The Herbert Park Hotel Developement, Former Johnson Mooney & O'Brien site, Ballsbridge Terrace, Ballsbridge, Dublin 4.
Floor area stated for this source: 25 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.