Commencement notice group

Housing commencement notices — Sligo

Sligo, Sligo

3 unique commencement events · latest notified commencement 05 Jun 2026 · planning reference supplied

View full project timeline

Unique commencement events
3
Latest notified commencement
05 Jun 2026
Latest notice
4 units
Planning references supplied
2460218
Public location
Sligo, Sligo

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
2
Exact completion events
0

Planning 2460218 — CONDITIONAL · Decision 2025-01-22 · Final grant 2025-03-13

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Sligo, Sligo
County
Sligo

Notice location variants

  • Pearse Road, Sli CN0129978SO
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official drawings and scanned-file sources are available below.

Public application drawings are available for this notice group.

Use the official drawings or scanned files to review the submitted plans and elevations.

  • Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 2460218. Sligo County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.
    Open official scanned files · external
  • Architecture Drawings Typical Infrastructure Details Exact official drawing for 2460218. Sligo County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Architecture Drawings House Type F Exact official drawing for 2460218. Sligo County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Official planning file Sligo County Council planning record Application details, status and decision record for 2460218. Sligo County Council Official link · last checked 29 Jul 2026 Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0142997SO BCMS owner-supplied export

1. Construction of 2 story apartment building accommodating 4 apartments numbered 70,71,72,& 73. 2. Creche.

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 700 m².

Planning reference 2460218 Builder stated: Kdm Construction Ltd Developer stated: Kdm Construction Ltd
SN0012802SO BCMS open-data feed

2 story apartment building accommodating 4 apartments numbered 19,20,21 and 22.

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 200 m².

Planning reference 2460218
CN0129978SO BCMS open-data feed

1. Construction of 89 no. residential units consisting of: a. 20 No. Type A/A1 – 2-storey, 2-Bed Semi Detached and Terraced Houses; b. 2 No. Type B – 2 -storey, 2-Bed Semi Detached and Terraced Houses; c. 6 No. Type C – 3 -storey, 3-Bed Semi Detached and Detached Houses; d. 38 No. Type D/D1 – 2 -storey, 3-Bed Semi Detached Houses; e. 8 No. Type E/E1 – 3 -storey, 5-Bed Semi Detached and Detached Houses; f. 12 No. Type F/F1 – 3 -storey, 5-Bed Semi Detached Houses; h 3 No. Type H – 2 Storey, 2-bed Terraced Houses; 3. Provision of public open space. 4. Pedestrian, cycle and vehicular access/egress to Pearse Road. 5. Residential car parking, site landscaping, boundary treatments, public lighting, pedestrian links, service connections and all associated site development works at Pearse Road, Sligo, Co.Sligo

Work stated for this notice 89 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 211,643 m².

Planning reference 2460218

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.