the existing Lidl Regional Distribution Centre — commencement notices
Mullingar, Westmeath
6 unique commencement events · latest notified commencement 11 Aug 2022 · planning reference supplied
- Unique commencement events
- 6
- Latest notified commencement
- 11 Aug 2022
- Latest notice
- 89 m²
- Planning references supplied
- 20/6195
- Public location
- Mullingar, Westmeath
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Mullingar, Westmeath
- County
- Westmeath
Notice location variants
- the existing Lidl Regional Distribution Centre, Lough Sheever Corporate Park, Mullingar, Co CN0092549WH, CN0078399WH, CN0072434WH
- Lough Sheever Corporate Park, Mullingar, Co CN0072435WH
- Notice source points are up to 411 m apart, so no combined representative point is shown.
Source positions remain separate:
- CN0092549WH · 53.543498, -7.340854 Open point
- CN0078399WH · 53.544012, -7.345133 Open point
- CN0072434WH · 53.545431, -7.343665 Open point
- CN0072435WH · 53.545387, -7.345114 Open point
- CN0071396WH · 53.545831, -7.345673 Open point
- CN0069878WH · 53.545340, -7.343236 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Material alteration to the store room at the existing Lidl Regional Distribution Centre, Lough Sheever Corporate Park, Mullingar, Co.Westmeath.
Floor area stated for this source: 89 m².
Construction of a new Goods In / Gatehouse building at the existing Lidl Regional Distribution Centre, Lough Sheever Corporate Park, Mullingar, Co.Westmeath.
Floor area stated for this source: 51 m².
Extension and material alteration to the administration block at the existing Lidl Regional Distribution Centre, Lough Sheever Corporate Park, Mullingar, Co.Westmeath.
Floor area stated for this source: 1,577 m².
Large extension and material alteration to the Regional Distribution Centre Warehouse Building at Lough Sheever Corporate Park, Mullingar, Co.Westmeath.
Floor area stated for this source: 32,980 m².
Stabilisation ground improvemement works to the proposed LIDL Regional Distribution Centre (RDC) extension, Lough Sheever Corporate Park, Mullingar, Co. Westmeath
Floor area stated for this source: 32,980 m².
Construction of a Temporary Accommodation Building located within the compound to the proposed LIDL Regional Distribution Centre (RDC), Lough Sheever Corporate Park, Mullingar, Co. Westmeath
Floor area stated for this source: 390 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.