Site start

Commercial site start — Lobinstown

Lobinstown, Meath

1 commencement notice · start date 26 Jul 2024 · planning reference given

Planning 23917 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
26 Jul 2024
Latest notice
187 m²
Planning reference
23917
Location
Heronstown, Lobinstown, Meath

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Lobinstown, Meath
County
Meath

Addresses on the notices

  • Heronstown, Lobinstown, Meath
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Meath County Council planning record Application details, status and decision record for 23917. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

a) construction of a new single storey office building and associated ancillary works (c. 189 sq. m gross), b) proposed new viewing deck to the north of the office building overlooking existing quarry (c. 30 sq.m), c) installation of 9 no. car parking spaces, d) installation of sheltered bicycle parking. The development also consists of e) retention of existing wastewater treatment system and associated percolation area (c. 30 sq. m) that will serve the proposed new office building, all within an application area of c. 0.29 hectares

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 187 m².

Planning reference 23917

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.