Site start
Building extension site start — Dublin
Dublin 15, Dublin
1 commencement notice · start date 09 Sep 2024 · planning reference given
Planning FW22A/0298 · Planning application
- Commencement notices
- 1
- Latest start date
- 09 Sep 2024
- Latest notice
- 1 unit
- Planning reference
- FW22A/0298
- Location
- Dublin 15, Dublin
Location
Where the site is
- Area
- Dublin 15, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(A) The removal of the existing roof structure and existing chimney structure to be replaced with (B) a replacement roof structure to include (C) new rear facing windows and (D) front facing solar panels and (E) te installation of a new internal staircase
Floor area stated for this source: 180 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.