Site start

Housing site start — Dublin

Dublin 1, Dublin

1 commencement notice · start date 24 Nov 2024 · planning references given

Planning 4500/22 (+4501/22)

Commencement notices
1
Latest start date
24 Nov 2024
Latest notice
142 m²
Planning references
4500/22 · 4501/22
Location
Dublin 1, Dublin

Location

Where the site is

Area
Dublin 1, Dublin
County
Dublin

Addresses on the notices

  • basement and ground floor level
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

The development will consist of; - Change of use form public house to retail at basement and ground floor level. - Associated internal alterations, inclusive of the addition of a new stairs to the basement retail area and ope formation to the retail area of 109 Marlborough Street at ground floor level. - Alterations to elevations to include revised shop front at street level; - Alterations to the previously granted (FSC2301275DC/7DN) bin store area of 28 Abbey St Lower. - All associated site works and services.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 142 m².

Planning reference 4500/22 Planning reference 4501/22

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.