Site start

Tara Street, Dublin 2

Dublin 2, Dublin

1 commencement notice · start date 24 Jul 2025 · no planning reference given

Commencement notices
1
Latest start date
24 Jul 2025
Latest notice
43 m²
Planning references
None given
Location
Tara Street, Dublin 2

Location

Where the site is

Area
Dublin 2, Dublin
County
Dublin

Addresses on the notices

  • Tara Street, Dublin 2
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Amalgamation of the two office spaces known as College House and Apollo House at each relevant floor level. These connections occur at 1st to 9th floor levels inclusive. The 10th floor already shared stairs between the two elements and it is noted that the ground floor reception areas are separated by commercial units and fire escape routes which remain unchanged. The proposed amalgamation is to facilitate a single tenant on each floor and/or throughout the building at College Square Dublin 2

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 43 m².

Developer stated: Marlet Property Group

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.