Site start
Building extension site start — Dublin
Dublin 6, Dublin
1 commencement notice · start date 18 Jun 2025 · planning reference given
Planning 4496/23 · Planning application
- Commencement notices
- 1
- Latest start date
- 18 Jun 2025
- Latest notice
- 252 m²
- Planning reference
- 4496/23
- Location
- Dublin 6, Dublin
Location
Where the site is
- Area
- Dublin 6, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: Removal of existing external stairs and base walls of return to facilitate construction of new single storey extension with rooflight; Alterations to lower ground floor layout, including converting rear window to doorway; Minor alterations on upper ground, first, and second floors including reinstatement of former door to front reception room, enlargement of first floor return bathroom, and converting second floor return bedroom to bathroom; Various repair and conservation works to the interior including new services, to facilitate reinstatement as single family dwelling following previous subdivision; Various repair and conservation works to the building envelope including repointing of front facade brickwork, repair and replastering of rear facades, refurbishment of original windows; installation of new rooflight and repairs to main roof. All associated ancillary, landscaping, drainage and site development works.
Floor area stated for this source: 252 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.