Site start
Site start — Dublin
Dublin 18, Dublin
2 commencement notices · latest start date 17 Apr 2024 · planning reference given
Planning ABP-308227-20
- Commencement notices
- 2
- Latest start date
- 17 Apr 2024
- Latest notice
- 27,034 m²
- Planning reference
- ABP-308227-20
- Location
- Dublin 18, Dublin
Location
Where the site is
- Area
- Dublin 18, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-308227-20. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Murphystown Way SHD, Dublin 18 comprising the construction of 249 units in 3 No. 4-13 storey blocks with double height basement carpark, childcare facility, amenity space & site ancillary works.
Floor area stated for this source: 27,034 m².
Source unit value with scope not stated: 249 units. It is not presented as notice-specific scale.
Murphystown Way SHD Enabling works comprising archaeological excavations; hoarding installation; boundary wall removal; topsoil removal & disposal; bulk excavations including breaking & removal of rock to facilitate new basement carpark; construction of access / haul roads; re-routing of existing underground utilities & services including installation of new utilities & services & tie-ins; Road upgrade works on Murphystown Way to include realignment of existing road markings, road kerbing & cycle lanes, new traffic calming ramp & signalised pedestrian crossing and soft landscaping.
Floor area stated for this source: 2,700 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.