Commencement notice group
Housing commencement notices — Wexford
Wexford, Wexford
1 unique commencement event · latest notified commencement 23 May 2024 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 23 May 2024
- Latest notice
- 80 m²
- Planning references supplied
- 20230860
- Public location
- Wexford, Wexford
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 20230860 Wexford County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Wexford, Wexford
- County
- Wexford
Notice location variants
- the rear
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wexford County Council planning record Application details, status and decision record for 20230860. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
to demolish an existing single storey extension to the rear of the existing dwelling, and to construct a new single storey extension in the same location as that to be demolished. The application also relates to the relocation of the front entrance door to match the original location (set back the same dimension as the adjoining dwellings) and to replace the front door in timber to match the original period style for the streetscape. The application also relates to the replacement of all windows with timber sash windows and for minor modifications to the first floor landing window at the rear. The application also relates to alterations to internal layouts and connections to existing services and all associated site works
Floor area stated for this source: 80 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.