1 unique commencement event · latest notified commencement 27 Mar 2023 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 27 Mar 2023
- Latest notice
- 5,474 m²
- Planning references supplied
- 19/164
- Public location
- Hillcrest, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 19/164 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Hillcrest, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 19/164. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The Public Sector Data Centre development will consist of the construction of 1 no. building described as follows: The building is c.5474 Sqm with an additional c.2826 Sqm in external plant area and is made up of three distinct parts. The central two storey block has a mono-pitch roof structure the ridge height of which is c.15.15m and it accommodates the data halls and associated plant and equipment rooms. The front block has a flat roof structure with a parapet and is two storey with a parapet height of c.10.60m and it accommodates the entrance reception, offices, meeting room, associated support areas, tea station, w.c’s, stores, plant areas including 5 no. backup generators and 2 no. substations (3MV). The third block is located to the rear of the main data hall block and consists mainly of an external two storey plant space with external stairways with intermediate level gangways. The two storey external plant area is screened (c.10.6m) by a metal mesh structure. There are also two, two-storey flat roof internal plant rooms connecting to the central block. The provision of a perimeter service road/ green road around the building to allow for access and maintenance of equipment to the front and rear of the block. The provision of a perimeter fence and access gates, hard and soft landscaping, signage and all associated site works. The area of the site relating to this Planning Application is 13,590Sqm / 1.359 Hectares.
Floor area stated for this source: 5,474 m².