Commencement notice group
Housing commencement notices — Ballivor
Ballivor, Meath
2 separate notices · latest notified commencement 20 Apr 2018 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 20 Apr 2018
- Latest notice
- 1,831 m²
- Planning references supplied
- 140621
- Public location
- Ballivor, Meath
Public source geography
Site location
- Public site / locality
- Ballivor, Meath
- County
- Meath
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 2 works comprising a single storey extension with 36no accessible bedrooms, ancillary and site works.
1,831 m² · stated on this notice
Proposed change of use and refurbishment of the existing 545m2 National School building to a proposed new nursing home and with the provision of additional extensions over two phases. The proposed change of use to a nursing home development is to provide for adequate day, dining, office, staff, spiritual and support space requirements. A Phase 1, 512.5m2, single storey extension is proposed to the rear of the existing and will consist of 13 no. single and 1 no. double, accessible, ensuite bedrooms with sanitary support spaces around a single, garden courtyard arrangement and will require the demolition of the existing, 23.5m2 bicycle shed in combination with a new landscaping arrangement to include for a horticulture area, the provision of solar / PV panels on the existing roof, together with the provision of 17 no. on-site parking spaces, behind the re-positioned front boundary wall, and all associated site and ancillary development works. Although not applied for Commencement Notice, the additional, Phase 2, 1795m2, single storey extension is proposed to the rear and will consist of 31 no. single and 5 no. double, accessible, ensuite bedrooms, additional day, staff and sanitary spaces around a second, garden courtyard arrangement and will require minor alternation to the internal layout of the existing structure, created for the Phase 1 development. A 21m2, single storey, flat roof, entrance porch to the front elevation of the existing façade is also proposed under Phase 2 of the development. 21 no. additional parking spaces and a service vehicle, parking bay is to be provided to the rear of the proposed together with all associated site and ancillary development works.
1,058 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.