Site start
Site start — Malahide
Malahide, Dublin
1 commencement notice · start date 20 Apr 2020 · planning reference given
Planning F19A/0627 · Planning application
- Commencement notices
- 1
- Latest start date
- 20 Apr 2020
- Latest notice
- Scale not stated
- Planning reference
- F19A/0627
- Location
- Malahide, Dublin
Location
Where the site is
- Area
- Malahide, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level and installing 75mm vertical band to clarify boundary line, at 9 Backstrand , Malahide , County Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alterations to Northeastern Elevation consisting of realigning and enlarging window at ground floor level and installing 75mm vertical band to clarify boundary line, at 9 Backstrand , Malahide , County Dublin.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.