Site start
Housing site start — Churchtown
Churchtown, Dublin
1 commencement notice · start date 20 Nov 2017 · planning reference given
Planning D17A/0287 · Planning application
- Commencement notices
- 1
- Latest start date
- 20 Nov 2017
- Latest notice
- 1 house
- Planning reference
- D17A/0287
- Location
- Churchtown, Dublin
Location
Where the site is
- Area
- Churchtown, Dublin
- County
- Dublin
Addresses on the notices
- No
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Demolition of existing side extension and subdivision of the site at No.2 Meadow View, Churchtown, Dublin 14 for construction of a two-storey three bedroom detached dwelling house to the South of the existing two-storey semi-detached dwelling, to include alterations to existing front boundary on Meadow View for creation of a new vehicular access gate. Proposals provide for all associated site works, including hard landscaping and site development works
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.