Commencement notice group
Housing commencement notices — Kells
Kells, Meath
1 unique commencement event · latest notified commencement 26 Jul 2019 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 26 Jul 2019
- Latest notice
- 1,754 m²
- Planning references supplied
- None stated
- Public location
- Kells, Meath
Public source geography
Site location
- Public site / locality
- Kells, Meath
- County
- Meath
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
construction of a new two storey service station with ancillary retail and food court including (1) service building measuring1771 M2 GIA, containing net retail floor space of 99m2, including off licence measuring 15m2, 3 no food/cafe offers (including drive thru restaurant) with preparation areas, storage, serving counters (measuring 212m2), Seating areas (measuring 283m2, back of house area(including staff canteen, wcs, showers, lockers etc)measuring 311m2, Public facilities (wcs, showers etc.) measuring 154m2, Storage, circulation, plant and ancillary areas measuring 712m2, and an external seating area measuring 40m2. (2) Full signage package including illuminated totem on Cavan rd., building signage and wayfinding signage throughout the site. (3) 4 no fuel pump islands with illuminated canopy over(including corporate logo), and 1 no HGV fuel pump island with illuminated canopy (including corporate logo). (4) 1 no jet wash and 1 no brush wash with water recycling capabilities & storage tank & water/ air facilities. (5) Extension and reconfiguration of part of the existing access road to provide a footpath, cycle lane and vehicular/pedestrian access to the site. (6) New pedestrian access from the Cavan Road footpath into the site (7) all associated and ancillary site works including 74 no parking spaces, 3 no electric car charging points, 5 no wheelchair accessible spaces, 4 no coach and 6 no HGV parking bays, partially covered cycle parking, landscaping, boundry treatments, public lighting, retaining walls , foothpaths, road markings, surfacing, rainwater storage & attenuation, underground tank farm, and new connection to public mains, foul sewer and storm main.
Floor area stated for this source: 1,754 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.