Site start
Housing site start — Dublin
Dublin 7, Dublin
1 commencement notice · start date 01 Sep 2025 · planning reference given
Planning WEB1356/25 · Planning application
- Commencement notices
- 1
- Latest start date
- 01 Sep 2025
- Latest notice
- 201 m²
- Planning reference
- WEB1356/25
- Location
- Dublin 7, Dublin
Location
Where the site is
- Area
- Dublin 7, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development consists of: (1) demolition of existing single-storey garage to side of property, (2) additions and alterations to the existing dwelling house to include; (a) construction of a two-storey extension to side, (b) construction of single-storey extension / porch to front, (c) alterations and extension of existing hipped main roof of dwelling to incorporate a full gable roof over new two-storey extension to side, (3) conversion of attic and construction of new zinc-clad dormer to rear, (4) installation of two roof-lights to the front pitch of main roof of dwelling, and, (5) all associated site, drainage and structural works.
Floor area stated for this source: 201 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.