Commencement notice group

Housing commencement notices — Dublin

Dublin 1, Dublin

4 unique commencement events · latest notified commencement 28 Dec 2022 · planning reference supplied

Unique commencement events
4
Latest notified commencement
28 Dec 2022
Latest notice
41 m²
Planning references supplied
ABP-305075-19
Public location
Dublin 1, Dublin

Commencement and completion records

Planning, start and completion evidence

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Exact planning records
Official record actions
0
Explicit planning relationships
Duplicate source rows consolidated
Exact completion events

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin 1, Dublin
County
Dublin

Notice location variants

  • Railway St, Dublin 1
  • Railway Street, Dublin 1
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-305075-19. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of single storey residential bin store (Bin Store 02) at Railway St, Dublin 1

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 41 m².

Appeal reference ABP-305075-19 Builder stated: Monami Construction Ltd Developer stated: Circle Voluntary Housing Association Clg
Notice 2 Commencement notice (owner-supplied)

Construction of single store bin store for Kiln residents (Bin Store 01) at Railway Street, Dublin 1

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 28 m².

Appeal reference ABP-305075-19 Builder stated: Monami Construction Ltd Developer stated: Circle Voluntary Housing Association Clg
Notice 3 Commencement notice (owner-supplied)

Construction of single storey residential bike store at Railway St, Dublin 1

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 75 m².

Appeal reference ABP-305075-19 Builder stated: Monami Construction Ltd Developer stated: Circle Voluntary Housing Association Clg
Notice 4 Commencement notice (owner-supplied)

The proposed development relates to the construction of residential development of between 4 and 7 storeys. The building will contain 47 apartments, a community room with its own entrance, and ancillary facilities.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 4,808 m².

Source unit value with scope not stated: 47 units. It is not presented as notice-specific scale.

Appeal reference ABP-305075-19 Builder stated: Monami Construction Ltd Developer stated: Circle Voluntary Housing Association

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.