Commencement notice group
Housing commencement notices — Ennis
Ennis, Clare
1 unique commencement event · latest notified commencement 04 Sep 2023 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 04 Sep 2023
- Latest notice
- 780 m²
- Planning references supplied
- P19-167
- Public location
- Ennis, Clare
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Ennis, Clare
- County
- Clare
Notice location variants
- Market Place, Ennis, Co CN0104723CE
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposed development consists of the construction of a standalone dwelling over shared basement, the change of use of an existing assembly building to two floors of apartments together with the demolition of an existing cottage and the construction of an apartment block extension to the existing assembly building at Market Place, Ennis, Co. Clare.
Floor area stated for this source: 780 m².
Source unit value with scope not stated: 14 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.