Commencement notice group
Building extension commencement notices — Raheny
Raheny, Dublin
1 separate notice · latest notified commencement 26 Jan 2026 · planning basis not stated
- Source notices
- 1
- Latest notified commencement
- 26 Jan 2026
- Latest notice
- 67 m²
- Planning references supplied
- None stated
- Public location
- Raheny, Dublin
Public source geography
Site location
- Public site / locality
- Raheny, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Construction of a single storey extension to the front, first floor extension on top of the existing single storey extension to the side, single storey extension to the rear and an attic conversion with a raised main ridge level and a dormer window to the rear
67 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.