Site start

Housing site start — Oranmore

Oranmore, Galway

2 commencement notices · latest start date 20 Mar 2019 · planning reference given

Planning 17/1268 · Council file · external

View full project timeline

Commencement notices
2
Latest start date
20 Mar 2019
Latest notice
7,841 m²
Planning reference
17/1268
Location
Oranmore, Galway

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
2
Completion certificates
0

Planning 17/1268 — CONDITIONAL · Decision 2018-06-07 · Final grant 2018-07-16

Exact appeal 301977 · Appeal withdrawn S.140(1)(a) · 2018-07-30 · Open official case

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Oranmore, Galway
County
Galway

Addresses on the notices

  • An Fuarán, Frenchfort, Dublin Road, Oranmore, Co
  • An Fuarán, Dublin Road, Oranmore,Co Galway
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official drawings and scanned-file sources are available below.

Public application drawings are available for this notice group.

Use the official drawings or scanned files to review the submitted plans and elevations.

  • Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 17/1268. Galway County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.
    Open official scanned files · external
  • Architecture Drawings 01/09/2017 Exact official drawing for 17/1268. Galway County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Architecture Drawings 01/09/2017 Exact official drawing for 17/1268. Galway County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Official planning file Galway County Council planning record Application details, status and decision record for 17/1268. Galway County Council Official link · last checked 29 Jul 2026 Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of units 21 to 24 and 45 to 86 including associated works at An Fuarán, Frenchfort, Dublin Road, Oranmore, Co. Galway.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 7,841 m².

Source unit value with scope not stated: 46 units. It is not presented as notice-specific scale.

Planning reference 17/1268
Notice 2 Commencement notice

Construction of units 1 to 44, excluding apartment and duplex units, including associated development works at An Fuarán, Dublin Road, Oranmore,Co Galway

Work stated for this notice 40 units Explicit phase quantity stated by the source.

Floor area stated for this source: 4,671 m².

Planning reference 17/1268

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.