Site start
Commercial site start — Maynooth
Maynooth, Kildare
1 commencement notice · start date 28 Sep 2020 · planning reference given
Planning 20/510 · Council file · external
- Commencement notices
- 1
- Latest start date
- 28 Sep 2020
- Latest notice
- 396 m²
- Planning reference
- 20/510
- Location
- Maynooth, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 1
- Open exact official planning record: 20/510 Kildare County Council
- Completion certificate recorded — source scope not stated Kildare County Council · commencement notice Completion certificate · First observed in the official monthly source 2020-09 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Maynooth, Kildare
- County
- Kildare
Addresses on the notices
- ground floor and 4no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 20/510. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Refurbishment of the existing 2-storey administration office building to accomodate a flexible event space at ground floor and 4no. guest bedrooms and ensuites at first floor level including; (a) reconfiguration of internal spaces, to include the removal of modern partition walls and the subsequent installation of new partition walls at ground and first floor levels; (b) Widening of existing openings in historic fabric; (c) Reinstatement of original door opening in the former pantry; (d) Works to existing timber floors to include the part replacement of existing suspended timber floor at ground level within the office space and adjoining corridor and its subsequent replacement with a new floor slab (at a lower level to facilitate access), works to the existing floor at first floor level to include structural strengthening, fire seperation and sound insulation; (e) Provision of 4no. ensuite bedrooms to serve the proposed guest bedrooms including related drainage and service works (including new opes in the historic wall for drainage); (f) Removal and replacement of 20th century timber stairs; (g) Provision of mechanical and electrical services to serve reconfigured layouts and proposed ensuite bedrooms; (h) External lighting to be fixed to the exterior facade (north-west and south-west elevations) of the building to the underside of the gutter; (i) Wall repointing, repairs and maintenance works to all windows, doors and the existing roof and reversible protective measures within the ornamental dairy to safeguard marble fixtures.
Floor area stated for this source: 396 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.