Site start
Commercial site start — Dublin
Dublin
1 commencement notice · start date 25 Sep 2024 · planning reference given
Planning 2396/20 · Planning application
- Commencement notices
- 1
- Latest start date
- 25 Sep 2024
- Latest notice
- 212 m²
- Planning reference
- 2396/20
- Location
- Dublin
Commencement and completion records
Planning, start and completion
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Planning applications
- Links to official records
- 0
- Links between applications
- Repeat copies merged
- Completion certificates
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Planning Permission for alterations and extension of the existing Medical Centre at ground level, to include the demolition of existing single storey stores and outbuildings, a single storey extension to the rear comprising 6 new consultation rooms, kitchen, staff and ancillary facilities. A new staff entrance on to the adjacent laneway, together with internal alterations to existing ground floor to include larger waiting area, reception and office space. All at 72 Willow Park Crescent, Glasnevin, Dublin 11.
Floor area stated for this source: 212 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.