Commencement notice group

Housing commencement notices — Waterford

Waterford, Waterford

1 unique commencement event · latest notified commencement 02 Feb 2026 · planning basis not stated

View full project timeline

Unique commencement events
1
Latest notified commencement
02 Feb 2026
Latest notice
52 houses
Planning references supplied
None stated
Public location
Waterford, Waterford

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning 2211 — CONDITIONAL · Decision 2022-11-10 · Final grant 2022-12-14

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Major-project dossier · Wave 1 · O32

Reviewed planning, commencement and document evidence

View the dossier catalogue
Source-limited dossier Useful reviewed evidence is published without filling gaps from unverified sources.

Source-backed scopeHousing commencement notices — Waterford

Planning scope and commencement-event scale are retained as separate evidence; this label is not expanded into unreviewed works.

Commencement identities
1
retained separately
Latest group date
02 Feb 2026
not assigned across events
Maximum on one notice
52 units
never summed
Reviewed index
6
6 exact document links

Planning and appeal references

Supplier screening cues

  • Residential scale screening cueMaximum stated scale on one retained notice: 52 units.
  • Built-area screening cueMaximum stated floor area on one retained notice: 5785.6 m².
  • Civil, drainage and roads package screening cueReviewed official index contains Engineering and drainage.
  • Architectural package screening cueReviewed official index contains Architecture drawings.

Every retained commencement event

  • 02 Feb 2026 CN0137963WD 52 units on this event · 5786 m² on this event Official public source URL unavailable in the reviewed projection

Exact organisation roles

  • Waterford City and County CouncilPlanningauthority · Authority recorded against the reviewed planning reference.

Official document index highlights

Reviewed public index extract; this is not asserted to be the complete authority file.

Source limitations and event boundary

Event identities aligned. The reviewed dossier snapshot and the current public group contain the same commencement references.

  • The public evidence source provides a project label, references, group-level maxima and a reviewed document extract; it does not provide a full permission description for this dossier.
  • Planning and appeal event dates are unavailable in the reviewed public source and are not inferred.
  • Organisation coverage is limited to the responsible planning authority and, where an appeal reference exists, An Coimisiún Pleanála; no supplier appointment is claimed.
  • Reviewed public index extract; this is not asserted to be the complete authority file.

Planning-anchored public geography

Site identity and location

Canonical public locality
Waterford, Waterford
County
Waterford
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Waterford City and County Council planning record Application details, status and decision record for 2211. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0137963WD BCMS open-data feed

Construction of 52 No. dwellings (Phase 5B) comprising 11 No. 4-bed, 2-storey semi-detached houses; 35 No. 3-bed, 2-storey semi-detached houses; and 6 No. 2-bed, 2-storey terraced houses arranged in 1 No. block of 6 units. The development also includes works to common areas and associated infrastructure serving these units, in accordance with the requirements of the Second Schedule of the Building Regulations.

Work stated for this notice 52 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 5,786 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.