Commencement notice group
Commercial commencement notices — Clane
Clane, Kildare
1 unique commencement event · latest notified commencement 01 Apr 2024 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 01 Apr 2024
- Latest notice
- 27,346 m²
- Planning references supplied
- 22/1307
- Public location
- Clane, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 22/1307 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Clane, Kildare
- County
- Kildare
Notice location variants
- first and second floor level and the existing first floor breakout rooms to 17no CN0111918KE
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 22/1307. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
for the change of use of the existing office space at first and second floor level and the existing first floor breakout rooms to 17no. additional bedrooms comprising, 7no. hotel bedrooms, 4no. hotel family rooms and 6no. hotel bedroom suites, office and storage space along with the removal of the existing first floor toilet facilities for the extension of the existing food preparation are
Floor area stated for this source: 27,346 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.