Site start
Housing site start — Ballinhassig
Ballinhassig, Cork
2 commencement notices · latest start date 15 Nov 2021 · planning reference given
Planning 17/7098 · Planning application
- Commencement notices
- 2
- Latest start date
- 15 Nov 2021
- Latest notice
- 816 m²
- Planning reference
- 17/07098
- Location
- Ballinhassig, Cork
Location
Where the site is
- Area
- Ballinhassig, Cork
- County
- Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of two semi-detached Dwelling houses and all ancillary works
Floor area stated for this source: 816 m².
Source unit value with scope not stated: 2 houses. It is not presented as notice-specific scale.
Demolition of existing unused agricultural building [The Old Loft] and the construction of a two storey dwelling house [House No.4] and ancillary site works and external spaces which include a connection to the existing main drainage and water infrastructure and provision of two car parking spaces per dwelling.
Floor area stated for this source: 101 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.