Site start
UPVC hall — site start
Ranelagh, Dublin
1 commencement notice · start date 10 Mar 2016 · planning reference given
Planning 4007/15
- Commencement notices
- 1
- Latest start date
- 10 Mar 2016
- Latest notice
- Scale not stated
- Planning reference
- 4007/15
- Location
- Ranelagh, Dublin
Location
Where the site is
- Area
- Ranelagh, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Opt Out demolition of single story kitchen and bathroom extension, 12.6m2 in area to rear. construction of part single story, part two story extension 44.7m2 in area, to side and rear comprising kitchen/dining, utility room and bathroom on ground floor and walk in closet and bathroom on first floor. Replacement of UPVC hall door and window on front elevation with timber door and sliding sash window to match adjoining house.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.