Site start

Housing site start — Raheny

Raheny, Dublin

1 commencement notice · start date 17 Feb 2020 · planning reference given

Planning 4008/19 · Planning application

View full project timeline

Commencement notices
1
Latest start date
17 Feb 2020
Latest notice
Scale not stated
Planning reference
4008/19
Location
Raheny, Dublin

Location

Where the site is

Area
Raheny, Dublin
County
Dublin

Addresses on the notices

  • first floor level to the side of dwelling with a hipped roof to match existing
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

A single storey extension at first floor level to the side of dwelling with a hipped roof to match existing. Structural adjustments to the attic to allow for potential conversion to study. New rooflights to the rear. Widening of existing vehicular entrance. All with ancillary site works.

Work stated for this notice Scale not stated for this notice.
Planning reference 4008/19 Developer stated: MBD Building Services Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.