Site start
Commercial site start — Dublin
Dublin
1 commencement notice · start date 28 Nov 2014 · planning reference given
Planning 3020/13
- Commencement notices
- 1
- Latest start date
- 28 Nov 2014
- Latest notice
- Scale not stated
- Planning reference
- 3020/13
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Change of use, alterations, refurbishment and repair works to the upper floors (levels 1, 2, 3 and 4) of 10, 11, 12 Westmoreland Street, a Protected Structure, from its current use as English School into 21no. additional Hotel Bedrooms, including 23no. new Ensuite bathrooms as an extension to the Fleet Street Hotel, Fleet St, Dublin 2.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.