Site start

Building extension site start — Carrick-On-Shannon

Carrick-On-Shannon, Leitrim

1 commencement notice · start date 08 Aug 2019 · planning reference given

Planning P.18/159

Commencement notices
1
Latest start date
08 Aug 2019
Latest notice
1 unit
Planning reference
P18/159
Location
Carrick-On-Shannon, Leitrim

Location

Where the site is

Area
Carrick-On-Shannon, Leitrim
County
Leitrim
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Planning Permission is sought from Leitrim County Council for the following development: 1.To renovate and extend existing single storey dwellinghouse, to include the demolition of existing single storey extension to the rear and replace with 1 ½ storey extension to rear. 2.To demolish existing utility room and domestic storage area. 3.To decommission existing site entrance and replace with boundary to match existing front boundary. 4.To upgrade existing agricultural entrance to provide main entrance. 5.To upgrade existing percolation area including all ancillary works necessary to complete the development.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 122 m².

Planning reference P18/159

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.