Commencement notice group

Harbour Court — commencement notices

Portlaoise, Laois

5 unique commencement events · latest notified commencement 02 May 2025 · planning reference supplied

Planning story

Portlaoise, Laois — Hepburn Court Part 8

Exact official references
Hepburn Court Part 8
Final official decision
Official Part 8 project
Unique commencement events
5
Latest notified commencement
02 May 2025

No overall constructed, completed-unit or percentage-progress figure is inferred from these notices.

Unique commencement events
5
Latest notified commencement
02 May 2025
Latest notice
241 m²
Planning references supplied
Hepburn Court Part 8
Public location
Portlaoise, Laois

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
1
Duplicate source rows consolidated
0
Exact completion events
1

Part 8 project · Hepburn Court Part 8

Hepburn Court Part 8 has an exact reviewed part 8 project relationship; the parent reference is not published in this projection.

Laois County Council · checked 2026-09-06T20:32:29.425083+00:00

Open exact official relationship evidence

  1. Completion certificate validated Laois County Council · commencement CN0120535LS Open official certificate CC00000063643LS Certificate CC00000063643LS · Certificate validation date 2026-08-24 See official certificate for completed works · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Portlaoise, Laois
County
Laois

Notice location variants

  • Rathdowney, Laois CN0096674LS
  • Mountmellick, Laois CN0087289LS
  • Harbour Court, Mountmellick, Co CN0087289LS
  • Ballyroan, Laois CN0071723LS
Location evidence needs care
  • Notice source points are up to 34.6 km apart, so no combined representative point is shown.

Source positions remain separate:

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0128443LS BCMS owner-supplied export

Construction of a new 5-bedroom semidetached unit at no 13 Lakeglen and all associated site works and connection to existing utilities . Refurbishment of No 14 Lakeglen.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 241 m².

Source unit value with scope not stated: 2 units. It is not presented as notice-specific scale.

Builder stated: Breencore Ltd
CN0120535LS BCMS owner-supplied export

The proposed development will consist of the construction of 54 dwelling, foul and surface water drainage works and surface water attenuation, footpaths and landscaped public open space with passive and active areas that includes a secure playground for young children, associated siteworks that includes boundary treatments and a total of 111 no. carparking spaces

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,277 m².

Source unit value with scope not stated: 54 houses. It is not presented as notice-specific scale.

Builder stated: Cleary & Doyle Construction Ltd
CN0096674LS BCMS owner-supplied export

Development of a terrace of 3 No. 3 bedroom Houses, 2 No. 2 Bed Apartments and 2 No. 1 Bed Apartments

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 515 m².

Source unit value with scope not stated: 14 units. It is not presented as notice-specific scale.

CN0087289LS BCMS open-data feed

Construction of 6 no. dwellings in 2 terraced blocks all with associated site works. New driveways, landscaping, boundary treatments and all ancillary site works necessary to facilitate the development on lands at Harbour Court, Mountmellick, Co. Laois

Work stated for this notice 6 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 2,250 m².

CN0071723LS BCMS owner-supplied export

Development of 10 No. 3 bedroom 2 Storey Dwelling Houses in 5 Semi- Detached Blocks

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 10,200 m².

Source unit value with scope not stated: 10 houses. It is not presented as notice-specific scale.

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.