Site start

Building extension site start — Donoughmore

Donoughmore, Cork

1 commencement notice · start date 19 Jul 2017 · planning reference given

Planning 14/5818 · Planning application

Commencement notices
1
Latest start date
19 Jul 2017
Latest notice
Scale not stated
Planning reference
14/05818
Location
Donoughmore, Cork

Location

Where the site is

Area
Donoughmore, Cork
County
Cork

No usable public source coordinate or reviewed official planning boundary is available for this notice group.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Material Alterations to the Existing School Building and Extension to the East of the Existing Single Storey School consisting of Two Mainstream Classrooms, Library, General Purpose Room and Associated Rooms along with Elevational Alterations to the Façade of the Existing School Building, provision of Designated Parking Space and Associated Site Works along with the removal of Existing Temporary Classroom and Resource Room Cabins from the Site.

Work stated for this notice Scale not stated for this notice.
Planning reference 14/05818

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.