Site start
Housing site start — Mount Merrion
Mount Merrion, Dublin
1 commencement notice · start date 03 Apr 2015 · planning reference given
Planning D14B/0278 · Planning application
- Commencement notices
- 1
- Latest start date
- 03 Apr 2015
- Latest notice
- Scale not stated
- Planning reference
- D14B/0278
- Location
- Mount Merrion, Dublin
Location
Where the site is
- Area
- Mount Merrion, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level and new master bedroom & bathroom at first floor level, and all ancillary site works
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alterations & additions to an existing semi- detached single storey bungalow, comprising the demolition of existing single storey utility & garage structures to gable end, & the construction of new single storey extension to side, with new main entrance door to front elevation, together with the construction of a new split-level dormer extension to rear of existing dwelling, comprising new kitchen / dining & living room at ground floor level and new master bedroom & bathroom at first floor level, and all ancillary site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.