Commencement notice group
St Brigids Hospital — commencement notices
Ballinasloe, Galway
1 unique commencement event · latest notified commencement 08 Aug 2022 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 08 Aug 2022
- Latest notice
- 771 m²
- Planning references supplied
- None stated
- Public location
- Ballinasloe, Galway
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Ballinasloe, Galway
- County
- Galway
Notice location variants
- St Brigids Hospital, Creagh, Ballinasloe, Co Galway on behalf of HSE West CN0092508GC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Refurbishment/Cons ervation works to East wing of admissions building on ground floor & first floor levels to include partial replacement/repair of first floor roof to South elevation, selected stone pointing, phased window replacement, installation of new passenger lift, alterations to existing internal layouts & replacement/upgrad e of existing external escape stairs, additional car park spaces, upgrade works to comply with Fire Cert requirements together with ancillary and associated works at St Brigids Hospital, Creagh, Ballinasloe, Co Galway on behalf of HSE West.
Floor area stated for this source: 771 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.