Commencement notice group

Housing commencement notices — Lisnageer

Lisnageer, Cootehill, Cavan

1 unique commencement event · latest notified commencement 29 Apr 2026 · planning reference supplied

Unique commencement events
1
Latest notified commencement
29 Apr 2026
Latest notice
1 house
Planning references supplied
2560074
Public location
Lisnageer, Cootehill, Cavan

Planning-anchored public geography

Site identity and location

Canonical public locality
Lisnageer, Cootehill, Cavan
County
Cavan
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Cavan County Council planning record Application details, status and decision record for 2560074. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0141553CN BCMS open-data feed

(1) construction of a two storey and single storey extension to side of existing dwelling to incorporate kitchen, living, bedroom and sanitary accommodation, (2) carrying out amendments and alterations to existing elevations and floor plan layouts to include family flat accommodation to existing ground floor area, (3) de-commissioning existing septic tank and percolation area, (4) installation of proprietary wastewater treatment unit and percolation area, (5) formation of new site entrance to public road and (6) completion of all ancillary site works and associated site structures

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 298 m².

Planning reference 2560074

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.