Site start
Housing site start — Glasnevin
Glasnevin, Dublin
2 commencement notices · latest start date 24 Jul 2017 · planning reference given
Planning 3755/14
- Commencement notices
- 2
- Latest start date
- 24 Jul 2017
- Latest notice
- Scale not stated
- Planning reference
- 3755/14
- Location
- Glasnevin, Dublin
Location
Where the site is
- Area
- Glasnevin, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new porch to front and construction of group and first floor extension to the back of existing dwelling.Demolition of part of existing rear to construct new extension and all associated site.
Construction of a new porch to the front and construction of a first floor level onto the side and back of the existing dwelling and all associated siteworks
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.