Site start
Commercial site start — Mitchelstown
Mitchelstown, Cork
1 commencement notice · start date 18 Mar 2015 · planning reference given
Planning 14/5908 · Planning application
- Commencement notices
- 1
- Latest start date
- 18 Mar 2015
- Latest notice
- Scale not stated
- Planning reference
- 14/05908
- Location
- Mitchelstown, Cork
Location
Where the site is
- Area
- Mitchelstown, Cork
- County
- Cork
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A New Butter Processing Facility for the manufacture, packaging and distribution of Butter products. The facility will comprise a main building ranging from c. 8.5m to 13.5m in height consisting of c.1,104m² of Office /ancillary accommodation arranged over two storeys, c.2,160m² of Single Storey Production space, c.1,673m² of Single storey storage/distribution space and c. 381m² of enclosed plant space; a single storey liquid ingredients intake building c.346m² with open plant area above of c. 9.5m in height; 10 No. liquid storage silos of c.15 m in height with associated access platforms; External Pipe Bridge; External Signage; External Utilities consisting of Electrical Transformer and switch rooms c.92m², Process water storage tank and pump house c.20m², Fire water and Sprinkler Water tanks and pump house c.36m², and a waste water balancing tank, all ranging from c. 1.5m to 5.7m in height; 50 No. Car Parking Spaces and 25 No. Bicycle Parking Spaces, roads with new entrances and entrance arrangements from the existing access road, landscaping, underground services and ancillary works. The total Area of Buildings is c. 5,934 m² on a site area of c. 2.62 Ha. All access to and from the site will be by way of the existing access road to Castlefarm from the N73 (Kildorrery) Roundabout. The proposed development will be located on a site on which Industrial Emissions Licence P0 404-02 (formerly the Integrated Pollution Prevention and Control Licence) currently operates.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.