Site start
Housing site start — Navan
Navan, Meath
1 commencement notice · start date 04 Sep 2020 · planning reference given
Planning KA191805 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 04 Sep 2020
- Latest notice
- Scale not stated
- Planning reference
- KA191805
- Location
- Navan, Meath
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: KA191805 Meath County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Navan, Meath
- County
- Meath
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Meath County Council planning record Application details, status and decision record for KA191805. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
(1) the removal of existing flat roof over single storey extension to North West side of existing dwelling, (2) demolition of existing car port area to North West of existing dwelling, (3) demolition of existing apex roof porch to South East side of existing dwelling, (4) demolition of existing flat roof porch to South West side of existing dwelling, (5) demolition of existing chimneys, (6) construction of a new flat roof and parapet walls over existing extension (being retained) to North West side of existing dwelling, (7) construction of a new single storey extension to South East side of existing dwelling, (8) fenestration amendments to existing dwelling, (9) internal amendments to existing dwelling, (10) fitting of velux window in existing South East facing roof, (11) decommissioning of existing septic tank and fitting of new wastewater treatment system and percolation in new location on site and (12) associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.