Commencement notice group
Building extension commencement notices — Rathcoole
Rathcoole, Dublin
1 unique commencement event · latest notified commencement 29 May 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 29 May 2026
- Latest notice
- 93 m²
- Planning references supplied
- SD25B/0582W
- Public location
- Rathcoole, Dublin
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 2
- Exact completion events
- 0
- Open exact official planning record: SD25B/0582W South Dublin County Council · checked 2026-08-01T21:13:03+00:00
Planning SD25B/0582W — GRANT PERMISSION · Decision 2026-03-02 · Final grant 2026-04-16
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Rathcoole, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD25B/0582W. South Dublin County Council Official link · last checked 01 Aug 2026 Exact official source shared from the planning and approval record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extend existing detached dormer bungalow. Extension renovation to include the following: Demolition of rear single storey extension, demolition of roof, demolition and rearrangement of internal space to allow new layout. Addition of a new dormer roof with raised ridgeline, three dormer windows to the front elevation, with rooflight on rear elevation, changes to fenestration on all elevations with the addition of a porch to the front elevation and all ancillary site works. Maintain connection to public sewerage and surface water and all ancillary site works.
Floor area stated for this source: 93 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.