Commencement notice group

Housing commencement notices — cummer

cummer, Galway

1 separate notice · latest notified commencement 23 Feb 2026 · planning reference supplied

Source notices
1
Latest notified commencement
23 Feb 2026
Latest notice
1 home
Planning references supplied
25/61531
Public location
cummer, Galway

Public source geography

Site location

Public site / locality
cummer, Galway
County
Galway

Public site labels seen across the notices

  • Corbally South, Cummer, Tuam, Co
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference25/61531

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0138382GC BCMS owner-supplied export

Proposed construction of two storey part single storey dwelling house and all associated site services and works at Corbally South, Cummer, Tuam, Co. Galway

1 home · 306 m² · stated on this notice

Planning reference 25/61531 Builder stated: Mardoc Developments Developer stated: Limehill Esker Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.